Railway News South Africa

#AfricaMonth

Subscribe

Elections 2024

The Weekly Update EP:04 Jan Moganwa debuts to talk MK Party, DA Burns the Flag and More!

The Weekly Update EP:04 Jan Moganwa debuts to talk MK Party, DA Burns the Flag and More!

sona.co.za

Advertise your job ad
    Search jobs

    Gautrain route last leg due in April, hopefully

    Engineering News Online reports that the remaining leg of the Gautrain route, running between Rosebank and Park station in downtown Johannesburg, was, as a best-case scenario, expected to open in "March, early April", according to Gautrain Management Agency (GMA) CEO Jack van der Merwe.

    This was three to four months later than the forecast provided by the Gauteng government in July last year, when it said the last stretch of the 80 km route would be in operation by the end of 2011. The original date for the start of operations on Phase 2 of the Gautrain - Pretoria to Park station - was March 2011, while the first phase of the rapid-rail link between the OR Tambo International Airport and Sandton stations, opened ahead of schedule.

    The Rosebank-Pretoria link of the R26.4-billion Gautrain project opened in August. However, Park station remained off limits following the more-than-expected water ingress in the tunnel connecting Rosebank and Park stations. A bus service was instituted to carry Gautrain passengers from Rosebank to Park station. Van der Merwe told Engineering News Online that remedial work to the tunnel involved an iterative grouting process that required the Bombela consortium, which had won the contract to build and operate the Gautrain system, to inject grout into the tunnel floor a number of times. This was expected to reduce the permeability of the rock mass and, thus, reduce the water which entered the tunnel drains.

    "It is difficult to calculate how many times you have to return to do this," noted Van der Merwe. He issued the same warning in July last year, noting at the time that the tunnel repairs would happen at no cost to the province and, therefore, the tax payer. The absence of an essential part of the Gautrain route has played havoc with passenger trip predictions, with more than 30 000 train passenger trips a day. The Gauteng government and the GMA, a provincial government agency, had been hopeful of 108 000 trips a day by the end of January.

    Read the full article on www.engineeringnews.co.za.

    Let's do Biz